{"id":1549,"date":"2025-09-04T01:35:41","date_gmt":"2025-09-04T01:35:41","guid":{"rendered":"https:\/\/epc-partners.com\/en\/?page_id=1549"},"modified":"2026-01-27T04:45:06","modified_gmt":"2026-01-27T04:45:06","slug":"project","status":"publish","type":"page","link":"https:\/\/epc-partners.com\/en\/project\/","title":{"rendered":"EPC Partners&#8217; Worldwide Footprints"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">The map below highlights the location of the projects we&#8217;ve participated in or supported through our partner companies<\/h4>\n\n\n\n<div>\n<iframe loading=\"lazy\" src=\"https:\/\/epcpartnersinc.maps.arcgis.com\/apps\/instant\/imageryviewer\/index.html?appid=4169e902636e40d59fd550c956c9fbe7\" width=\"100%\" height=\"600\" frameborder=\"0\" style=\"border:0\" allowfullscreen>iFrames are not supported on this page.<\/iframe>\n  <\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Our key project engagements<\/h2>\n\n\n\n<h4 class=\"wp-block-heading\">We are affiliated with and actively support companies across various regions worldwide. Our key strength lies in our ability to collaborate seamlessly with international partners, even when facing complex challenges or situations.<\/h4>\n\n\n\n<div class=\"image-grid\">\n\t<div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/asahikasei-mizushima-thermal-power-plant-renovation-1-x-29-1mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/asahi-kasei-3d-1.jpg\" alt=\"ASAHI KASEI MIZUSHIMA THERMAL PPWER PLANT RENNOVATION\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/asahikasei-mizushima-thermal-power-plant-renovation-1-x-29-1mw\/\">Asahikasei Mizushima Thermal Power Plant Renovation (1 x 29.1MW)<\/a><\/strong><\/p>\n      <p class=\"description\"> <a href=\"https:\/\/www.toptal.com\/designers\/htmlarrows\/symbols\/white-right-pointing-index\/\"><\/a>&#9758; Technical Advisor for Civil Design\/Engineering\/Construction <br\/>\n        &#9758; Preparation of Civil Drawings for Construction Plan (3D drawings) <br\/>\n        &#9758; Claim Managemnt and Advice <br\/>\n        &#9758; Civil Construction Manager <br\/>\n      &#9758; Mechanical Construction Manager<\/p>\n  <\/div>\n  <div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/menengai-geothermal-power-plant-1-x-35mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/10\/menengai-epc.jpg\" alt=\"OLKARIA ADDITIONAL UNIT 6 GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/menengai-geothermal-power-plant-1-x-35mw\/\">Menengai Geothermal Power Plant (1 x 35MW)<\/a><\/strong><\/p>\n    <p class=\"description\"> &#9758; Project Mangement <br\/>\n     &#9758; Civil Construction Manager<\/p>\n  <\/div>\n\t<div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/aluto-langano-geothermal-power-plant-1-x-5mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/10\/aluto-langano-3d-epc.jpg\" alt=\"OLKARIA ADDITIONAL UNIT 6 GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/aluto-langano-geothermal-power-plant-1-x-5mw\/\">Aluto Langano Geothermal Power Plant (1 x 5MW) <\/a><\/strong><\/p>\n    <p class=\"description\"> &#9758; Project Mangement <br\/>\n      &#9758; Civil Construction Manager<\/p>\n  <\/div>\n  <div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/appi-geothermal-power-plant-1-x-14-9mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/project-appi.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/appi-geothermal-power-plant-1-x-14-9mw\/\">Appi Geothermal Power Plant (1 x 14.9 MW)<\/a><\/strong><\/p>\n    <p class=\"description\"> &#9758; Mechnical\/Piping Supervisor<\/p>\n    <\/div>\n  <div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/project-wave-innovative-water-treatment-transportation-system-522000-m3-day\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/10\/adnoc-epc.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/project-wave-innovative-water-treatment-transportation-system-522000-m3-day\/\">Project Wave (Innovative Water Treatment &#038; Transportation System) (522,000 m3\/day)<\/a><\/strong><\/p>\n    <p class=\"description\">  &#9758; Civil Manager in Bidding Stage <br\/>\n     &#9758; Preparation of Civil Drawings for Bidding<\/p>\n    <\/div>\n\t<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/al-kharsaah-solar-power-plant-800-mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/project-kharsaa.jpg\" alt=\"AL KHARSAAH SOLAR POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/al-kharsaah-solar-power-plant-800-mw\/\">Al Kharsaah Solar Power Plant (800 MW)<\/a><\/strong><\/p>\n<p class=\"description\">&#9758; Technical Advisor for Civil Design\/Engineering\/Construction <br\/>\n   &#9758; Progress Monitoring and Advice for EPC<\/p>\n  <\/div>\n  <div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/rantau-dedap-geothermal-power-plant-2-x-49-2-mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/project-rantaudedap.jpg\" alt=\"RANTAU DEDAP GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/rantau-dedap-geothermal-power-plant-2-x-49-2-mw\/\">Rantau Dedap Geothermal Power Plant (2 \u00d7 49.2 MW)<\/a><\/strong><\/p>\n<p class=\"description\">&#9758; Program Manager\/Project ControllorDesign\/Engineering\/Construction <\/p>\n    <\/div>\n\t<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/al-wakra-sewage-treatment-plant-stp-150000-m3-day-terminal-pump-station-tps-treated-sewage-effluent-managemnt-facilites-tse-facilities\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/25-wakra-sewage.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/al-wakra-sewage-treatment-plant-stp-150000-m3-day-terminal-pump-station-tps-treated-sewage-effluent-managemnt-facilites-tse-facilities\/\">Al Wakra Sewage Treatment Plant (STP) (150,000 m3\/day) \/ Terminal Pump station (TPS) \/ Treated Sewage Effluent Managemnt Facilites (TSE Facilities)<\/a><\/strong><\/p>\n    <p class=\"description\"> &#9758; Civil Manager in Bidding Stage <br\/> \n      &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div>\n  <div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/codelco-water-supply-project-swro-desalination-plant-transportation-system-72576-m3-day\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/24-codelco.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/codelco-water-supply-project-swro-desalination-plant-transportation-system-72576-m3-day\/\">CODELCO Water Supply Project (SWRO Desalination Plant &#038; Transportation System)  (72,576 m3\/day)<\/a><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/codelco-water-supply-project-swro-desalination-plant-transportation-system-72576-m3-day\/\"><\/a><\/strong><\/p>\n    <p class=\"description\">&#9758; Technical Advisor for Bidding in Civil Works<\/p>\n    <\/div>\n\t<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/jubail-3b-iwp-swro-desalination-plant-570000-m3-day\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/23-jubail-3b_.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/jubail-3b-iwp-swro-desalination-plant-570000-m3-day\/\">Jubail 3B IWP (SWRO Desalination Plant)  (570,000 m3\/day)<\/a><\/strong><\/p>\n    <p class=\"description\"> &#9758; Civil Manager in Bidding Stage <br\/> \n      &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div>\n    <div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/olkaria-i-additional-unit-6-geothermal-power-plant-1-x-83mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/project-olkaria.jpg\" alt=\"OLKARIA ADDITIONAL UNIT 6 GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/olkaria-i-additional-unit-6-geothermal-power-plant-1-x-83mw\/\">Olkaria I Additional Unit 6 Geothermal Power Plant (1 x 83MW)<\/a><\/strong><\/p>\n    <p class=\"description\">  &#9758; Civil Construction Manager <br\/>\n      &#9758; Project Controller<br\/> \n      &#9758; Lead Electrical Design Engineer <br\/>\n      &#9758; Contract Manager<\/p>\n    <\/div>\n    <div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/jubail-3a-iwp-swro-desalination-plant-600000-m3-day\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/21-jubail.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/jubail-3a-iwp-swro-desalination-plant-600000-m3-day\/\">Jubail 3A IWP (SWRO Desalination Plant)  (600,000 m3\/day )<\/a><\/strong><\/p>\n    <p class=\"description\"> &#9758; Civil Manager in Bidding Stage <br\/> \n      &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div>\n\t<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/yanbu-4-iwp-swro-desalination-plant-450000-m3-day\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/20-yanbu4.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/yanbu-4-iwp-swro-desalination-plant-450000-m3-day\/\">Yanbu 4 IWP (SWRO Desalination Plant)  (450,000 m3\/day)<\/a><\/strong><\/p>\n    <p class=\"description\"> &#9758; Civil Manager in Bidding Stage <br\/> \n      &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div>\n\t<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/shuqaiq-3-iwp-swro-desalination-plant-450000-m3-day\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/10\/shuqaiq3-epc.jpg\" alt=\"SHUQAIQ WATER DESALINATION PROJECT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/shuqaiq-3-iwp-swro-desalination-plant-450000-m3-day\/\">Shuqaiq 3 IWP (SWRO Desalination Plant)  (450,000 m3\/day)<\/a><\/strong><\/p>\n    <p class=\"description\"> &#9758; Civil Manager in Bidding Stage <br\/> \n      &#9758; Preparation of Civil Drawings for Bidding<\/p>\n    <\/div>\n\t<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/rabigh-3-iwp-swro-desalination-plant-600000-m3-day\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/18-Rabigh-3-IWP-Saudi-1024x576.jpeg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/rabigh-3-iwp-swro-desalination-plant-600000-m3-day\/\">Rabigh 3 IWP (SWRO Desalination Plant)  (600,000 m3\/day)<\/a><\/strong><\/p>\n    <p class=\"description\"> &#9758; Civil Manager in Bidding Stage <br\/> \n      &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div>\n\t<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/taweelah-iwp-swro-desalination-plant-909200-m3-day\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/17-Taweelah-RO-project.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/taweelah-iwp-swro-desalination-plant-909200-m3-day\/\">Taweelah IWP (SWRO Desalination Plant)  (909,200 m3\/day)<\/a><\/strong><\/p>\n    <p class=\"description\">  &#9758; Technical Advisor for Bidding in Civil Works<\/p>\n  <\/div>\n  <div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/muara-laboh-geothermal-power-plant-1-x-85-2-mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/project-muaralaboh.jpg\" alt=\"MUARA LABOH GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/muara-laboh-geothermal-power-plant-1-x-85-2-mw\/\">Muara Laboh Geothermal Power Plant (1 x 85.2 MW)<\/a><\/strong><\/p>\n\t\t<p class=\"description\"> &#9758; Site Manager <br> \n\t\t  &#9758; Progress Manager\/Project Controller <\/br> \n\t\t Civil Supervisor<\/p>\n    <\/div>\n<div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/bibiyana-iii-combined-cycle-power-project-400-mw\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/15-bibiyana-3.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/bibiyana-iii-combined-cycle-power-project-400-mw\/\">Bibiyana-III Combined Cycle Power Project (400 MW)<\/a><\/strong><\/p>\n    <p class=\"description\">&#9758; Technical Advisor for TG Pedestal Work<\/p>\n  <\/div>\n<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/hong-river-surface-water-treatment-plant-transportation-system-300000-m3-day\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/14-hong-river-treatment-plant.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/hong-river-surface-water-treatment-plant-transportation-system-300000-m3-day\/\">Hong River Surface Water Treatment Plant &#038; Transportation System (300,000 m3\/day)<\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Civil Manager in Bidding Stage <br> \n    &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div>\n<div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/ulubelu-unit-3-4-geothermal-power-plant-2-x-58-8-mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/project-ulubelu.jpg\" alt=\"ULUBELU UNIT 3 &#038; 4 GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/ulubelu-unit-3-4-geothermal-power-plant-2-x-58-8-mw\/\">Ulubelu Unit 3 &amp; 4 Geothermal Power Plant (2 \u00d7 58.8 MW)<\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Site Manager <br> \n    &#9758; Progress Manager\/Project Controllor<\/p>\n  <\/div>\n<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/umm-al-hayman-wastewater-project-stp-wastewater-tse-pipelines-pumping-stations-and-vast-reservoirs-500000-m3-day\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/12-umm-hayman.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/umm-al-hayman-wastewater-project-stp-wastewater-tse-pipelines-pumping-stations-and-vast-reservoirs-500000-m3-day\/\">Umm Al Hayman Wastewater Project (STP, Wastewater &#038; TSE Pipelines, Pumping Stations and Vast Reservoirs) (500,000 m3\/day)<\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Civil Manager in Bidding Stage <br> \n    &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div>\n<div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/theistareykir-geothermal-power-plant-2-x-45mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/project-theistareykir.jpg\" alt=\"THEISTAREYKIR GEOTHERMAL POWER PLANT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/theistareykir-geothermal-power-plant-2-x-45mw\/\">Theistareykir Geothermal Power Plant (2 x 45MW)<\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Technical Advisor for TG Pedestal Work<\/p>\n    <\/div>\n<div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/thai-binh-unit-1-thermal-power-plant-2-x-300-mw\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/10-thai-binh-1.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/thai-binh-unit-1-thermal-power-plant-2-x-300-mw\/\">Thai Binh Unit 1 Thermal Power Plant (2 x 300 MW)<\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Technical Advisor for TG Pedestal Work<\/p>\n  <\/div>\n<div class=\"image-box\" style=\"border: 3px solid red; padding: 10px; border-radius: 5px;\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/qassim-unit-2-3-conversion-project-3-x-136-mw\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/qassim2conversion-1024x593.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/qassim-unit-2-3-conversion-project-3-x-136-mw\/\">Qassim Unit 2 &#038; 3 Conversion Project (3 x 136 MW) <\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Technical Advisor for TG Pedestal Work<\/p>\n  <\/div>\n<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/barka-sohar-iwp-swro-desalination-plant-280900-m3-day-250000-m3-day\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/08-barka-1.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/barka-sohar-iwp-swro-desalination-plant-280900-m3-day-250000-m3-day\/\">Barka &#038; Sohar IWP (SWRO Desalination Plant)  (280,900 m3\/day &#038; 250,000 m3\/day)<\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Civil Manager in Bidding Stage <br> \n    &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div>\n<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/barka-1-expansion-phase-2-iwp-swro-desalination-plant-56800-m3-day\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/barka.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/barka-1-expansion-phase-2-iwp-swro-desalination-plant-56800-m3-day\/\">Barka-1 Expansion Phase 2 IWP (SWRO Desalination Plant)  (56,800 m3\/day )<\/a><\/strong><\/p>\n\t<p class=\"description\"> &#9758; Technical Advisor for civil design\/engineering\/construction <br> \n    &#9758; Progress Monitoring and Advice for EPC<\/p>\n  <\/div>\n  <div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/san-lorenzo-wind-farm-project-54-mw\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/project-windfarm.jpg\" alt=\"SAN LORENZO WIND FARM GUIMARAS 54 MW TURNKEY PROJECT\"><\/a>\n      <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/san-lorenzo-wind-farm-project-54-mw\/\">San Lorenzo Wind Farm Project (54 MW)<\/a><\/strong><\/p>\n\t  <p class=\"description\">&#9758; Project Manager\/Site Manager<\/p>\n    <\/div>\n  <div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/gtc-599-600-606-611-transmission-pipelines-for-km-mega-reservoirs\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/transmission-pipelines-1024x683.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/gtc-599-600-606-611-transmission-pipelines-for-km-mega-reservoirs\/\">GTC 599\/600\/606\/611 &#8211; Transmission Pipelines for KM Mega Reservoirs<\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Civil Manager in Bidding Stage <br> \n    &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div> \n   <div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/ro-desalination-plant-supporting-infrastructure-work-for-qatar-foundation-education-city-20000-m3-day\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/7b-4-with-logo.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/ro-desalination-plant-supporting-infrastructure-work-for-qatar-foundation-education-city-20000-m3-day\/\">RO Desalination Plant &#038; Supporting Infrastructure Work for Qatar Foundation &#8211; Education City (20,000 m3\/day)<\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Civil Manager in Bidding Stage <br> \n     &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div> \n<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/al-ghubrah-iwp-swro-desalination-plant-190900-m3-day\/\"><img decoding=\"async\" src=\"https:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/09\/ghubrah.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/al-ghubrah-iwp-swro-desalination-plant-190900-m3-day\/\">Al Ghubrah IWP (SWRO Desalination Plant)  (190,900 m3\/day)<\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Civil Manager in Bidding Stage <br> \n    &#9758; Preparation of Civil Drawings for Bidding<\/p>\n  <\/div>\n<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/gtc-142-e-2006-phase-viii-qatar-power-transmission-system-expansion-6x-220kv-cable-circuits\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/10\/GTC-142-E.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/gtc-142-e-2006-phase-viii-qatar-power-transmission-system-expansion-6x-220kv-cable-circuits\/\">GTC\/142\/E\/2006 \u201cPhase VIII &#8211; Qatar Power Transmission System Expansion\u201d (6x 220kV cable circuits)<\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Civil Design Manager<br>\n    &#9758; Preparation of Civil Design Documents\/Drawings <br>\n    &#9758; Permit Management <br>\n    &#9758; Progress Monitoring and Advice for EPC<br>\n    &#9758; Claim Managemnt and Advice<br>\n    &#9758; Civil Management for Additional Works\/Repair Works<br>\n    &#9758; Preparation of Civil Drawings for Additional Works\/Repair Works<\/p>\n  <\/div>\n<div class=\"image-box\"> <a href=\"https:\/\/epc-partners.com\/en\/portfolio\/gtc-124-2006-c-phase-vii-qatar-power-transmission-system-expansion-4x-220kv-cable-circuits\/\"><img decoding=\"async\" src=\"http:\/\/epc-partners.com\/en\/wp-content\/uploads\/2025\/10\/GTC-124C.jpg\" alt=\"APPI GEOTHERMAL POWER PLANT\"><\/a>\n    <p class=\"description\"><strong><a href=\"https:\/\/epc-partners.com\/en\/portfolio\/gtc-124-2006-c-phase-vii-qatar-power-transmission-system-expansion-4x-220kv-cable-circuits\/\">GTC\/124\/2006\/C \u201cPhase VII \u2013 Qatar Power Transmission System Expansion\u201d (4x 220kV cable circuits) <\/a><\/strong><\/p>\n\t<p class=\"description\">&#9758; Civil Design Manager<br>\n    &#9758; Preparation of Civil Design Documents\/Drawings <br>\n    &#9758; Permit Management <br>\n    &#9758; Progress Monitoring and Advice for EPC<br>\n    &#9758; Claim Managemnt and Advice<br>\n    &#9758; Civil Management for Additional Works\/Repair Works<br>\n    &#9758; Preparation of Civil Drawings for Additional Works\/Repair Works<\/p>\n  <\/div>\n  <\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The map below highlights the location of the projects we&#8217;ve participated in or supported through our partner companies iFrames are not supported on this page. Our key project engagements We &#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1549","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/epc-partners.com\/en\/wp-json\/wp\/v2\/pages\/1549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epc-partners.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/epc-partners.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/epc-partners.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epc-partners.com\/en\/wp-json\/wp\/v2\/comments?post=1549"}],"version-history":[{"count":81,"href":"https:\/\/epc-partners.com\/en\/wp-json\/wp\/v2\/pages\/1549\/revisions"}],"predecessor-version":[{"id":2497,"href":"https:\/\/epc-partners.com\/en\/wp-json\/wp\/v2\/pages\/1549\/revisions\/2497"}],"wp:attachment":[{"href":"https:\/\/epc-partners.com\/en\/wp-json\/wp\/v2\/media?parent=1549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}