The map below highlights the location of the projects we’ve participated in or supported through our partner companies

Our key project engagements

We are affiliated with and actively support companies across various regions worldwide. Our key strength lies in our ability to collaborate seamlessly with international partners, even when facing complex challenges or situations.

ASAHI KASEI MIZUSHIMA THERMAL PPWER PLANT RENNOVATION

Asahikasei Mizushima Thermal Power Plant Renovation (1 x 29.1MW)

☞ Technical Advisor for Civil Design/Engineering/Construction
☞ Preparation of Civil Drawings for Construction Plan (3D drawings)
☞ Claim Managemnt and Advice
☞ Civil Construction Manager
☞ Mechanical Construction Manager

OLKARIA ADDITIONAL UNIT 6 GEOTHERMAL POWER PLANT

Menengai Geothermal Power Plant (1 x 35MW)

☞ Project Mangement
☞ Civil Construction Manager

OLKARIA ADDITIONAL UNIT 6 GEOTHERMAL POWER PLANT

Aluto Langano Geothermal Power Plant (1 x 5MW)

☞ Project Mangement
☞ Civil Construction Manager

APPI GEOTHERMAL POWER PLANT

Appi Geothermal Power Plant (1 x 14.9 MW)

☞ Mechnical/Piping Supervisor

APPI GEOTHERMAL POWER PLANT

Project Wave (Innovative Water Treatment & Transportation System) (522,000 m3/day)

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

AL KHARSAAH SOLAR POWER PLANT

Al Kharsaah Solar Power Plant (800 MW)

☞ Technical Advisor for Civil Design/Engineering/Construction
☞ Progress Monitoring and Advice for EPC

RANTAU DEDAP GEOTHERMAL POWER PLANT

Rantau Dedap Geothermal Power Plant (2 × 49.2 MW)

☞ Program Manager/Project ControllorDesign/Engineering/Construction

APPI GEOTHERMAL POWER PLANT

Jubail 3B IWP (SWRO Desalination Plant) (570,000 m3/day)

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

OLKARIA ADDITIONAL UNIT 6 GEOTHERMAL POWER PLANT

Olkaria I Additional Unit 6 Geothermal Power Plant (1 x 83MW)

☞ Civil Construction Manager
☞ Project Controller
☞ Lead Electrical Design Engineer
☞ Contract Manager

APPI GEOTHERMAL POWER PLANT

Jubail 3A IWP (SWRO Desalination Plant) (600,000 m3/day )

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

APPI GEOTHERMAL POWER PLANT

Yanbu 4 IWP (SWRO Desalination Plant) (450,000 m3/day)

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

SHUQAIQ WATER DESALINATION PROJECT

Shuqaiq 3 IWP (SWRO Desalination Plant) (450,000 m3/day)

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

APPI GEOTHERMAL POWER PLANT

Rabigh 3 IWP (SWRO Desalination Plant) (600,000 m3/day)

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

APPI GEOTHERMAL POWER PLANT

Taweelah IWP (SWRO Desalination Plant) (909,200 m3/day)

☞ Technical Advisor for Bidding in Civil Works

MUARA LABOH GEOTHERMAL POWER PLANT

Muara Laboh Geothermal Power Plant (1 x 85.2 MW)

☞ Site Manager
☞ Progress Manager/Project Controller
Civil Supervisor

APPI GEOTHERMAL POWER PLANT

Bibiyana-III Combined Cycle Power Project (400 MW)

☞ Technical Advisor for TG Pedestal Work

APPI GEOTHERMAL POWER PLANT

Hong River Surface Water Treatment Plant & Transportation System (300,000 m3/day)

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

ULUBELU UNIT 3 & 4 GEOTHERMAL POWER PLANT

Ulubelu Unit 3 & 4 Geothermal Power Plant (2 × 58.8 MW)

☞ Site Manager
☞ Progress Manager/Project Controllor

APPI GEOTHERMAL POWER PLANT

Umm Al Hayman Wastewater Project (STP, Wastewater & TSE Pipelines, Pumping Stations and Vast Reservoirs) (500,000 m3/day)

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

THEISTAREYKIR GEOTHERMAL POWER PLANT

Theistareykir Geothermal Power Plant (2 x 45MW)

☞ Technical Advisor for TG Pedestal Work

APPI GEOTHERMAL POWER PLANT

Thai Binh Unit 1 Thermal Power Plant (2 x 300 MW)

☞ Technical Advisor for TG Pedestal Work

APPI GEOTHERMAL POWER PLANT

Qassim Unit 2 & 3 Conversion Project (3 x 136 MW)

☞ Technical Advisor for TG Pedestal Work

APPI GEOTHERMAL POWER PLANT

Barka & Sohar IWP (SWRO Desalination Plant) (280,900 m3/day & 250,000 m3/day)

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

APPI GEOTHERMAL POWER PLANT

Barka-1 Expansion Phase 2 IWP (SWRO Desalination Plant) (56,800 m3/day )

☞ Technical Advisor for civil design/engineering/construction
☞ Progress Monitoring and Advice for EPC

SAN LORENZO WIND FARM GUIMARAS 54 MW TURNKEY PROJECT

San Lorenzo Wind Farm Project (54 MW)

☞ Project Manager/Site Manager

APPI GEOTHERMAL POWER PLANT

GTC 599/600/606/611 – Transmission Pipelines for KM Mega Reservoirs

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

APPI GEOTHERMAL POWER PLANT

RO Desalination Plant & Supporting Infrastructure Work for Qatar Foundation – Education City (20,000 m3/day)

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

APPI GEOTHERMAL POWER PLANT

Al Ghubrah IWP (SWRO Desalination Plant) (190,900 m3/day)

☞ Civil Manager in Bidding Stage
☞ Preparation of Civil Drawings for Bidding

APPI GEOTHERMAL POWER PLANT

GTC/142/E/2006 “Phase VIII – Qatar Power Transmission System Expansion” (6x 220kV cable circuits)

☞ Civil Design Manager
☞ Preparation of Civil Design Documents/Drawings
☞ Permit Management
☞ Progress Monitoring and Advice for EPC
☞ Claim Managemnt and Advice
☞ Civil Management for Additional Works/Repair Works
☞ Preparation of Civil Drawings for Additional Works/Repair Works

APPI GEOTHERMAL POWER PLANT

GTC/124/2006/C “Phase VII – Qatar Power Transmission System Expansion” (4x 220kV cable circuits)

☞ Civil Design Manager
☞ Preparation of Civil Design Documents/Drawings
☞ Permit Management
☞ Progress Monitoring and Advice for EPC
☞ Claim Managemnt and Advice
☞ Civil Management for Additional Works/Repair Works
☞ Preparation of Civil Drawings for Additional Works/Repair Works